Flooding Case studies GCSE

Cockermouth, UK – Rich Country (MEDC) Picture Causes: Rain A massive downpour of rain (31.4cm), over a 24-hour period triggered the floods that hit Cockermouth and Workington in Cumbria in November 2009

What caused all the rain? The long downpour was caused by a lengthy flow of warm, moist air that came down from the Azores in the mid-Atlantic. This kind of airflow is common in the UK during autumn and winter, and is known as a ‘warm conveyor’. The warmer the air is, the more moisture it can hold.

What else helped to cause the Cumbrian Floods? · The ground was already saturated, so the additional rain flowed as surface run-off straight into the rivers · The steep slopes of the Cumbrian Mountains helped the water to run very rapidly into the rivers · The rivers Derwent and Cocker were already swollen with previous rainfall · Cockermouth is at the confluence of the Derwent and Cocker (i.e. they meet there)

The effects of the flood · Over 1300 homes were flooded and contaminated with sewage · A number of people had to be evacuated, including 50 by helicopter, when the flooding cut off Cockermouth town centre · Many businesses were flooded causing long-term difficulties for the local economy · People were told that they were unlikely to be able to move back into flood-damaged homes for at least a year. The cost of putting right the damage was an average of £28,000 per house · Insurance companies estimated that the final cost of the flood could reach £100 million · Four bridges collapsed and 12 were closed because of flood damage. In Workington, all the bridges were destroyed or so badly damaged that they were declared unsafe – cutting the town in two. People faced a huge round trip to get from one side of the town to the other, using safe bridges · One man died– PC Bill Barker

Responses to the flood · The government provided £1 million to help with the clean-up and repairs and agreed to pay for road and bridge repairs in Cumbria · The Cumbria Flood Recovery Fund was set up to help victims of the flood. It reached £1 million after just 10 days · Network Rail opened a temporary railway station in Workington The ‘Visit Cumbria’ website provided lists of recovery services and trades, and people who could provide emergency accommodation

Management of future floods at Cockermouth £4.4 million pound management scheme New flood defence walls will halt the spread of the river Funding from Government and local contributors River dredged more regularly to deepen the channel New embankments raise the channel height to reduce the likelihood of extra floods New floodgates at the back of houses in Waterloo street

Pakistan, Asia – Poor Country Picture At the end of July 2010 usually heavy monsoon rains in northwest Pakistan caused rivers to flood and burst their banks. The map below shows the huge area of Pakistan affected by flooding. The floodwater slowly moved down the Indus River towards the sea.

Continuing heavy rain hampered the rescue efforts. After visiting Pakistan, the UN Secretary General, Ban Ki-moon, said that this disaster was worse than anything he’d ever seen. He described the floods as a slow-moving tsunami.

The effect of the floods · At least 1600 people died · 20 million Pakistanis were affected (over 10% of the population), 6 million needed food aid · Whole villages were swept away, and over 700,000 homes were damaged or destroyed · Hundreds of thousands of Pakistanis were displaced, and many suffered from malnutrition and a lack of clean water · 5000 miles of roads and railways were washed away, along with 1000 bridges · 160,000km2 of land were affected. That’s at least 20% of the country · About 6.5 million acres of crops were washed away in Punjab and Sindh provinces

The responses to the floods · Appeals were immediately launched by international organisation, like the UK’s Disasters Emergency Committee – and the UN – to help Pakistanis hit by the floods · Many charities and aid agencies provided help, including the Red Crescent and Medecins Sans Frontieres · Pakistan’s government also tried to raise money to help the huge number of people affected · But there were complaints that the Pakistan government was slow to respond to the crisis, and that it struggled to cope · Foreign Governments donated millions of dollars, and Saudi Arabia and the USA promised $600 million in flood aid. But many people felt that the richer foreign governments didn’t do enough to help · The UN’s World Food Programme provided crucial food aid. But, by November 2010, they were warning that they might have cut the amount of food handed out, because of a lack of donations from richer countries

gcse geography flooding case study

Final dates! Join the tutor2u subject teams in London for a day of exam technique and revision at the cinema. Learn more →

Reference Library

Collections

  • See what's new
  • All Resources
  • Student Resources
  • Assessment Resources
  • Teaching Resources
  • CPD Courses
  • Livestreams

Study notes, videos, interactive activities and more!

Geography news, insights and enrichment

Currated collections of free resources

Browse resources by topic

  • All Geography Resources

Resource Selections

Currated lists of resources

  • Topic Videos

Somerset Levels flooding | AQA GCSE Geography | Weather Hazards 12

Last updated 13 Nov 2023

  • Share on Facebook
  • Share on Twitter
  • Share by Email

This revision video looks at the case study of the Somerset Levels Floods which is a popular case study for the UK extreme weather event. We explore the factors that led to such extensive flooding, the social, economic and environmental impacts of the flooding, along with the immediate and long-term responses used to help the people affected.

It is part of the AQA GCSE Geography course - Paper 1: Unit A - The Challenge of Natural Hazards.

  • The video is a revision resource for AQA GCSE Geography, specifically focusing on the Somerset Levels floods.
  • The floods occurred in January and February 2014, marking one of the worst incidents of flooding in recent years.
  • Somerset is in South West England, characterized by low-lying farmland and wetlands known as the Somerset Levels and Moors.
  • The area is bordered by the Bristol Channel, Quantock Hills to the west, and Mendip Hills to the north.
  • The floods were triggered by the wettest January on record, with 35 centimeters of rain falling in January and February—10 centimeters more than average.
  • High tides clashed with storm surges, blocking fresh water from reaching the sea, and local rivers, not dredged for over 20 years, had reduced capacity.
  • Social impacts included over 600 houses flooded, 16 farms evacuated, and villages cut off, leading to significant disruptions in daily life.
  • Economic impacts estimated at over £10 million, affecting farming, trade, and infrastructure.
  • Environmental impacts involved contaminated floodwaters with sewage and pollutants, requiring extensive cleanup.
  • Immediate responses included evacuations, temporary accommodations, and support from volunteers.
  • Long-term responses involved a £20 million flood action plan, including dredging rivers, raising road levels, installing flood defenses, and strengthening Riverbanks to mitigate future risks.
  • Weather events
  • Extreme weather
  • Weather hazards

You might also like

River floods.

Study Notes

Cyclone Pam hits vulnerable island nations

14th March 2015

gcse geography flooding case study

3 great simulation games for geography lessons

2nd February 2016

Soft Engineering

Stunning 3d visualisation of a tornado.

24th May 2015

gcse geography flooding case study

Storm Steve, Wendy and Barney

20th October 2015

It never rains but it pours

27th October 2015

The Iraq Sand River Explained

22nd November 2015

Our subjects

  • › Criminology
  • › Economics
  • › Geography
  • › Health & Social Care
  • › Psychology
  • › Sociology
  • › Teaching & learning resources
  • › Student revision workshops
  • › Online student courses
  • › CPD for teachers
  • › Livestreams
  • › Teaching jobs

Boston House, 214 High Street, Boston Spa, West Yorkshire, LS23 6AD Tel: 01937 848885

  • › Contact us
  • › Terms of use
  • › Privacy & cookies

© 2002-2024 Tutor2u Limited. Company Reg no: 04489574. VAT reg no 816865400.

River flooding - causes and management - Eduqas Flood risk - the causes of flooding

Hard engineering management involves using artificial structures, such as dams and embankments. Soft engineering management is a more natural approach to manage flooding, such as floodplain zoning.

Part of Geography Landscape and physical processes

Flood risk - the causes of flooding

Flooding occurs when a river bursts its banks and overflows onto the surrounding land. There are many factors which can cause a flood - often the natural landscape can influence flooding and human interactions can increase the risk.

Causes of flooding

  • Prolonged rainfall - if it rains for a long time, the land around a river can become saturated close saturated Unable to contain any more liquid. (it's holding as much water or moisture as can be absorbed). If there is more rainfall it cannot be soaked up, so it runs along the surface this is known as surface run-off close surface run-off The water that runs over the surface of the land when the soil is unable to absorb it. .
  • Heavy rainfall - if there is heavy rainfall there is less chance of it being soaked up by the soil ( infiltration close infiltration Water that soaks into the ground. ) so it runs off into the river. The faster the water reaches the river, the more likely it will flood. Water travelling over the surface (surface runoff) will reach a river quicker than water travelling through the ground (through flow and groundwater flow).
  • Relief - a steep valley is more likely to flood than a flatter valley because the rainfall will run off into the river more quickly.
  • Geology - permeable rocks close permeable rock A type of rock which allows water to pass through its joints and cracks, eg limestone. allow water to pass through pores and cracks, whereas impermeable rocks close impermeable rock Rock which does not allow water to pass through it, eg granite. do not. If a valley is made up of impermeable rocks, there is a higher chance of flooding as there is an increase in surface run-off.
  • Vegetation - trees and plants absorb water, this is known as interception close interception When trees and plants stop water from reaching the surface. . Lots of vegetation reduces flood risk. Sometimes people cut down trees ( deforestation close deforestation The cutting down of trees and forests to allow a different land use. ). This will increase the flood risk, as the water will not be intercepted and more will flow into the river.
  • Urban land use - when an area surrounding a river is built on, it increases the amount of tarmac and concrete, which are impermeable surfaces. Drains and sewers take water directly and quickly to the river which increases the flood risk.

Effects of flooding

Floods can cause damage to homes and possessions as well as disruption to communications. However, flooding can also have more positive impacts. Flooding deposits fine silt close silt Fertile sand-sized particles found in the lower course of a river. Also known as alluvium. (alluvium) onto the floodplain, making it very fertile and excellent for farming.

Low-income countries close low income country (LIC) Based on the World Bank's income classifications, a LIC has a gross national income (GNI per capita) of $1,045 or lower. (LICs) are usually affected more than High-income countries close high income country (HIC) A country with a gross national income per capita above US $12,735 (according to the World Bank) such as the Netherlands and the UK. (HICs) by the impacts of flooding. LICs often do not have the resources to prevent flooding or deal with its aftermath. More people rely on agriculture in LICs and fertile floodplains are attractive places to live and so have high population densities.

More guides on this topic

  • Coastal processes - Eduqas
  • Coastal landforms - erosion and deposition - Eduqas
  • Managing coastal hazards - Eduqas
  • River processes - Eduqas
  • River landforms - Eduqas

Related links

  • Video of Tewkesbury flooding

Morpeth Floods

A case study of a flood management scheme in the UK  - The Morpeth Floods Morpeth is an ancient market town situated in a loop of the river Wansbeck in the northeast of England about 15 miles north of Newcastle upon Tyne and 12 miles west from the North Sea. Following a flood in 1963, a flood defence scheme was established. Flood walls were erected on the north bank to protect the main business district. Housing properties at Middle Greens on the south bank were also protected by flood walls. When the River Wansbeck swelled on the 6th and 7th September 2008 (see photo below by Tzdelski via Wikimedia Commons), the floodwater simply flowed over the top of the defences, which were not high enough to hold back the volume of water. This resulted in a new flood defence scheme being required.

Morpeth Floods

Causes of the 2008 Floods The flood of 2008 was estimated to have been a 1 in 115 year event. It was caused by; 1. Prolonged rainfall - The Environment Agency recorded a HUGE 150 millimetres of precipitation falling in the Wansbeck catchment between Friday 5 September and Saturday 6 September.  2. The River Wansbeck Valley is narrow and steep and as a consequence has exaggerated amounts of surface runoff. 3. The soil was already saturated as a result of the wet summer, the effect of surface runoff was greatly enhanced. 4. Increased urbanisation since the 1960s in Morpeth meant that most water falling on the town would have drained directly to the river channel. 5. Other tests investigating the catchment lag time (time lapse between the mid point of storm rainfall and peak river level) indicate that the Wansbeck has a LAG time of only 8 hours. This means that any water falling in the catchment area would have been rapidly converted into channel flow by surface runoff and to a lesser extent by throughflow. This resulted in a peak water level of 3.99 metres recorded in the river channel, the biggest flow ever recorded in the Wansbeck.

Social Impacts During 6 September 2008, more than 400 residents were evacuated.  Shelter was provided in the Town Hall, King Edward VI High School and County Hall. An error made by the Environment Agency's warning system meant that 198 properties in the Middle Greens area of the town did not receive a flood warning. Fire fighters, ambulance crews, the RAF, the RNLI and the British Red Cross were among the emergency services involved in rescue and recovery operations over the weekend. Many residents had to be forced from their homes, and lived in caravans or with relatives as rebuilding took place.

Economic Impacts 995 properties in Morpeth town centre were directly affected by the flood water. Early estimates suggested that damages could be over £10 million, but the Journal Newspaper later claimed it was £40 million. On Sunday 7 September, Morpeth Lions Club and the Red Cross launched the Morpeth Flood Disaster Fund and by Wednesday 10 September had raised over £20,000. Environmental At the peak of the flood, Morpeth High Street (Bridge Street) was under 60 centimetres (2.0 ft) of water. Not since 1963 had the main street been flooded. The library suffered severe structural damage due to the heavy debris transported by the river. Such was the extent of the damage that structural engineers were required to test its safety. Houses were full of mud and sewage.

THE NEW FLOOD MANAGEMENT SCHEME

Morpeth Flood Defence scheme

The social, economic and environmental issues involved with the flood management scheme. This flood management scheme has many issues, which can be viewed as social, economic, and environmental.  Overall, the scheme cost £27 million pounds, a massive sum of money to protect residents in a small town in the North of England.  The flood walls were also raised to a height of 1.8m, which obscures the view of the river for many residents and which intrudes in the natural landscape.  The walls are also a barrier to some forms of wildlife.  The culvert clearance is a good thing, as this provides areas with faster flowing drains for some fish and birds, and the reservoir will reduce the flood risk significantly. 

NEXT TOPIC - Glacial Processes OR Coastal processes (St Mary's Students)

Locations of visitors to this page

©2015 Cool Geography

  • Copyright Policy
  • Privacy & Cookies
  • Testimonials
  • Feedback & support

Hot Wired IT Solutions Logo

  • What factors affect hazards?
  • Plate Boundaries
  • Why do People Live Near Tectonic Hazards?
  • Managing Tectonic Hazards
  • Haiti Earthquake
  • Christchurch Earthquake
  • Global Atmospheric Circulation
  • Where do they form?
  • Tropical Storm Formation
  • Tropical Storm Management
  • Typhoon Haiyan
  • The Somerset Levels Floods
  • Evidence for climate change
  • Natural causes
  • Human causes
  • Introduction to ecosystems
  • Charateristics
  • Plants and Animals
  • Causes of Deforestation
  • Deforestation in Malaysia
  • Sustainable Management
  • Characteristics
  • Opportunities in the Desert
  • Challenges in a Desert
  • Causes of Desertification
  • Managing Desertification
  • The UK's relief and landscape
  • Drainage Basin
  • Fluvial Processes
  • Erosional Landforms
  • Depositional Landforms
  • The River Tees Case Study
  • Causes of Flooding
  • Hydrographs
  • River Flooding Management
  • Banbury Flood Case Study
  • Weathering and Mass Movement
  • Coastal Marine Processes
  • Coastal Erosion Landforms
  • Coastal Deposition Landforms
  • Purbeck Coast Case Study
  • Hard Engineering for Coastal Erosion
  • Soft Engineering for Coastal Erosion
  • Holderness Coast Case Study
  • City Growth and Mega Cities
  • The Growth of Rio
  • Opportunities
  • Urban Planning
  • Migration and Nottingham
  • Urban Regeneration
  • Environmental Sustainability
  • Social Sustainability
  • Economic Sustianability
  • Integrated Transport System
  • Development Indicators
  • Demographic Transition Model
  • Population Pyramids
  • Physical Causes
  • Economic Causes
  • Colonialism
  • Consequences of uneven development
  • Debt Relief
  • Nigeria in the Wider World
  • Nigeria's Industrial Structure
  • TNCs in Nigeria
  • Impact of Aid
  • Environmental Issues in Nigeria
  • Quality of Life in Nigeria
  • Changes in the UK economy
  • Post Industrial Economy
  • UK Science and Business Parks
  • Environmental Impacts of Industry
  • Changing Rural Landscapes in the UK
  • Changing Transport Infrastructure
  • The North-South Divide
  • The UK in the Wider World
  • Provision of Food in the UK
  • The Provision of Water in the UK
  • The Provision of Energy in the UK
  • Global Energy Supply and Demand
  • Impact of Energy Insecurity
  • Increasing Energy Supply
  • Gas: A non-renewable resource
  • Sustainable Energy Use
  • The Chambamontera Micro-Hydro Scheme
  • Methodology
  • Data presentation
  • Conclusions
  • Data Presentation
  • Command words
  • Latitude and Longitude
  • Describing distribution
  • Describing location
  • Proportional Symbols
  • Isoline maps
  • Choropleth maps
  • Grid References
  • Height on maps
  • Measuring distance
  • Photograph interpretation
  • Issue Evaluation

Banbury Flooding Case Study

Why does it need protecting.

  • It has a history of large floods
  • Floods in the past have shut down the town's railway station and local roads
  • In 1998 the cost of the flood was £12.5 million
  • 150 homes and business have been affected

Flood management in Banbury:

  • The A361 has been raised
  • Floodwall built around motorsport company Prodrive
  • New pumping stations to transfer rainwater 
  • Flow control structures called the Hardwick flow control structure and the Huscote flow control structure (they control the amount of water in the River Cherwell )
  • A Biodiversity Action Plan (BAP) habitat with ponds, trees and hedgerows
  • Embankment made from soil and is 4.5m high
  • The borrow area. It's where the soil for the embankment came from and is now a small reservoir that stores water that otherwise would have caused the river to burst its bank.

Costs and benefits:

gcse geography flooding case study

  • 0 Shopping Cart

Internet Geography

Banbury Flood Management Scheme

gcse geography flooding case study

Banbury is a historic market town located in Oxfordshire, England. It is situated on the banks of the River Cherwell (a tributary of the River Thames), near the northeastern edge of the Cotswolds. Banbury is approximately 64 miles (103 kilometres) northwest of London and 22 miles (35 kilometres) north of Oxford, the county town of Oxfordshire.

Why was the Banbury flood management scheme required?

Banbury has been affected by flooding of the River Cherwell numerous times. The 1998 flood led to the closure of the railway station and caused £12.5 million in damage. There was further flooding in 2007.

What is the Banbury flood management strategy?

In 2012, an innovative project was completed to construct a flood storage reservoir north of the town at an investment of £18.5 million. The scheme involved building a 3-kilometre-long and 4.5-metre-high embankment, paralleling the M40 motorway, to form a 3 million cubic meters storage basin. The purpose of the reservoir is to regulate the flow of surplus rainwater into the river, using specially engineered outlets to discharge the water slowly. When heavy rainfall occurs, the surplus water accumulates in the storage reservoir. This water is then gradually released into the River Cherwell over the following days, mitigating any sudden influx that could potentially escalate the town’s flood risk.

The key features of the scheme included:

  • Raising the A361
  • Constructing a floodwall around motorsport company Prodrive
  • Constructing new pumping stations to transfer water

Banbury Flood Control Structure

Banbury Flood Control Structure

  • A biodiversity Action Plan (BAP) habitat with ponds, trees and hedgerows
  • Constructing 4.5m high embankments using soil taken from the borrow area, which is now a small reservoir used for storing water that would otherwise have caused the River Cherwell to flood

What issues resulted from the scheme?

Social issues

  • The A361 is no longer affected by flooding, reducing transport disruption for local people.
  • The new green areas and footpaths have improved the quality of life for local people.
  • Reduced anxiety in local communities as the risk of flooding has been reduced.

Economic issues

  • The cost of the scheme was £18.5 million.
  • The benefits are estimated at over £100 million.
  • 441 houses and 73 commercial properties are protected from flooding.
  • Property values have increased as they are no longer at risk of flooding.

Environmental issues

  • Around 100,000 tonnes of earth were required to make the embankment resulting in some habitat destruction.
  • The Biodiversity Action Plan (BAP) has resulted in planting trees and hedgerows and constructing ponds.
  • The BAP has created new ponds, trees and hedgerow habitats.
  • Part of the floodplain will be left to flood if river levels get too high.
  • The reservoir provides a temporary habitat for waterbirds.
  • The concrete apertures are unnatural in the landscape .

Internet Geography Plus

Premium Resources

Please support internet geography.

If you've found the resources on this page useful please consider making a secure donation via PayPal to support the development of the site. The site is self-funded and your support is really appreciated.

Related Topics

Use the images below to explore related GeoTopics.

Changing rates of rainforest deforestation

Topic home, next topic page, share this:.

  • Click to share on Twitter (Opens in new window)
  • Click to share on Facebook (Opens in new window)
  • Click to share on Pinterest (Opens in new window)
  • Click to email a link to a friend (Opens in new window)
  • Click to share on WhatsApp (Opens in new window)
  • Click to print (Opens in new window)

If you've found the resources on this site useful please consider making a secure donation via PayPal to support the development of the site. The site is self-funded and your support is really appreciated.

Search Internet Geography

Top posts and pages.

Geography Case Studies

Latest Blog Entries

AQA GCSE Geography Pre-release Resources 2024

Pin It on Pinterest

  • Click to share
  • Print Friendly

IMAGES

  1. CASE STUDY AQA GCSE Geog Boscastle flood management

    gcse geography flooding case study

  2. AQA GCSE Geography: Water on the Land

    gcse geography flooding case study

  3. CCEA GCSE UNIT 1- Causes of Flooding- Somerset Levels, 2014 Case Study

    gcse geography flooding case study

  4. GCSE Cockermouth Flooding Case Study

    gcse geography flooding case study

  5. GCSE River Flooding Case study UK

    gcse geography flooding case study

  6. boscastle flooding case study

    gcse geography flooding case study

VIDEO

  1. AQA Geography GCSE

  2. Cumbrian Floods 2009

  3. Tewkesbury flooding case study

  4. The River Quaggy

  5. GCSE Geography Revision

  6. GRADE 11 GEOGRAPHY UNIT 5_5.2.3 FLOODING EVENTS AND POVERTY #ethioedu Part 5 በአማረኛ

COMMENTS

  1. Flooding case study

    Learn about and revise river flooding, and hard and soft engineering strategies to prevent flooding, with GCSE Bitesize Geography (Eduqas). ... Eduqas Flooding case study - Cumbria, 2021.

  2. Flooding Case studies GCSE

    He described the floods as a slow-moving tsunami. The effect of the floods. · At least 1600 people died. · 20 million Pakistanis were affected (over 10% of the population), 6 million needed food aid. · Whole villages were swept away, and over 700,000 homes were damaged or destroyed.

  3. The Somerset Levels Flood Case Study

    The Somerset Levels Flood Case Study. The Somerset Levels are a coastal plain and wetland area in Somerset, England. Thousands of years ago, the area was covered by the sea, but today it's a landscape of rivers and wetlands - artificially drained, irrigated and modified to allow productive farming.. It is claimed that the Somerset Levels are one of the lowest areas in the UK.

  4. GCSE Geography

    One of the worse incidents of flooding in recent years took place in the Somerset Levels in Jan and Feb 2014 - with many villages underwater for several weeks. Somerset is in south-west England. The Somerset Levels and the Somerset Moors form an extensive area of low-lying farmland and wetlands, which are bordered by the Bristol Channel and Quantock Hills to the west and the Mendip Hills to ...

  5. Flood management case study

    Learn about and revise river management, and hard and soft engineering strategies to prevent flooding, with GCSE Bitesize Geography (AQA).

  6. PDF Case Study Notes

    The Somerset Levels. The Somerset Levels are an area of low-lying coastal plains and wetlands located in the south-west of the UK in the county of Somerset. Several rivers flow through the Somerset Levels and drain into the Bristol Channel, notably the River Tone and River Parrett. The low-lying nature of the area makes it prone to flooding ...

  7. Somerset Levels Floods 2014 (Extreme Weather Case Study)

    Case study of the Somerset Levels floods in 2014. This is the eighteenth video for the AQA GCSE 9-1 Geography course, and the eighteenth video of the Challen...

  8. Somerset Levels flooding

    This revision video looks at the case study of the Somerset Levels Floods which is a popular case study for the UK extreme weather event. We explore the factors that led to such extensive flooding, the social, economic and environmental impacts of the flooding, along with the immediate and long-term responses used to help the people affected. It is part of the AQA GCSE Geography course - Paper ...

  9. Somerset Levels Flooding

    This revision video looks at the case study of the Somerset Levels Floods which is a popular case study for the UK extreme weather event. We explore the fact...

  10. PDF Case Study Notes

    Sheffield is a city in South Yorkshire that experienced devastating floods in June 2007. Heavy and prolonged rainfall overwhelmed the city's drainage systems, and the River Don - which flows through Sheffield - burst its banks. This caused widespread flooding and many issues in Sheffield: 2 people died, over 1,200 homes were flooded, 1,000 ...

  11. UK Floods Case Study November 2019

    Heavy downpours across large parts of northern England led to surface water and river flooding in parts of Yorkshire, Nottinghamshire, Greater Manchester, Derbyshire and Lincolnshire. According to the Met Office, on Thursday 7th November 2019 over half of the average rainfall for the whole of November fell in parts of the Midlands and Yorkshire.

  12. Flood risk

    Learn about and revise river flooding, and hard and soft engineering strategies to prevent flooding, with GCSE Bitesize Geography (Eduqas). BBC Homepage. ... Flooding case study - Cumbria, 2021;

  13. GCSE Geography- Case study- The Jubilee River flood relief channel

    The Jubilee River flood relief that was created to divert water from the River Thames, so the Thames wouldn't overflow its banks. It is 11.7 km long, 50 m and cost £110 million to build. It was created to look and act like a natural river. What were the social issues? What are the environmental issues? Study with Quizlet and memorize ...

  14. Tewkesbury Floods 2007 Case Study

    The flooding in Tewkesbury was the result of both natural and human factors. The primary natural cause was the extreme and persistent rainfall during the summer, which led to the rivers Severn and Avon converging near Tewkesbury, overflowing their banks. The town's geographical setting made it inherently susceptible to flooding.

  15. Coolgeography

    A case study of a flood management scheme in the UK - The Morpeth Floods Morpeth is an ancient market town situated in a loop of the river Wansbeck in the northeast of England about 15 miles north of Newcastle upon Tyne and 12 miles west from the North Sea. Following a flood in 1963, a flood defence scheme was established.

  16. Banbury Flood Case Study

    Environmental. The A361 can continue to be open in a flood so people can still go to school and work etc. Quality of life is improved as there are new footpaths and green areas. recued levels of anxiety through fear of flooding. The cost of the scheme was £18.5 million. It protects 441 houses and 73 commercial properties.

  17. GCSE geography

    South of Scottish border. Cockermouth west cumbria. Causes: •deep Atlantic depression - record rainfall in 36 hrs so ground is saturated. •anticedent rainfall - month before flood so ground is saturated so runoff increases. •gradient - cockermouth at the bottom of 2 steep valleys so water runs off before infiltration can occur.

  18. Banbury Case Study

    Ec: The scheme cost £18.5 million. Env: 100,000 tonnes of soil were dug up and displaced to build the embankments on the A40. Study with Quizlet and memorize flashcards containing terms like Which river flows through Banbury?, When did flooding cause a shutdown of the town's railway?, What were the effects of the flood? and more.

  19. Geography Case Studies

    Geography Case Studies - A wide selection of geography case studies to support you with GCSE Geography revision, homework and research. Twitter; Facebook; Youtube; 0 Shopping Cart +Plus. Log In; ... The Somerset Levels Flood Case Study. UK Floods Case Study November 2019. River Management.

  20. GCSE geography managing floods in Banbury case study

    Study with Quizlet and memorize flashcards containing terms like In the Cotsworld Hills about 50km north os Oxford. Population about 45000, -Banbury is located on the floodplain of the Richer Cherwell (this is a tributary of the River Thames) -The geology and geography of the valley that the River Cherchwell runs through makes it particilarly suscceptible to flooding, -closure of town's ...

  21. GCSE Geography

    GCSE Geography - The Cockermouth Floods - Case Study. What were the causes? Click the card to flip 👆. A downpour of rainwater (31.4 cm fell in 24 hours) A lengthy flow of warm & moist air known as a 'warm conveyor'. Ground was already saturated, the rivers of the area already filled. Click the card to flip 👆.

  22. The River Severn Case Study

    The River Severn Case Study - landforms of erosion and deposition. The River Severn (Afon Hafren) is the UK's longest river at 354 km (220 miles) long. The upper, middle and lower course of the River Severn. The source of the River Severn is on the slopes of Plynlimon (the highest point of the Cambrian Mountains) in mid-Wales at around 600 ...

  23. Banbury Flood Management Scheme

    The Great Floods of 2000; Kerala flood case study; Rocks, Resources and Scenery. Geological time is on a different time to human time; Rock Types and the Rock Cycle; ... AQA GCSE Geography Pre-release Resources 2024 24 March 2024 - 10:27 pm. GCSE Geography Mind Maps 14 March 2024 - 2:02 pm.